Clubs and
Community Centres
|
|
|
Burwood
RSL Club - Redevelopment
CLIENT: Burwood RSL Club
PROJECT VALUE: $20 million
PROJECT DESCRIPTION:The new building provided a 2 storey car-park for
170 cars and 3 levels of Club facilities including an auditorium,
restaurants, function rooms and bar areas.
special features:The
22m diameter domed roof to the auditorium was designed in structural
steel and erected in Stage 1 to allow early completion of the floors
below. Temporary steel
columns were provided to support the dome until the Stage 2 floor was
completed.
scp involvement:
Design and documentation of post tensioned floor slabs, concrete columns
and lift walls and steel roofing.
Construction services.
|
|
|
EXTENSIONS TO
DUBBO RSL MEMORIAL CLUB
CLIENT:
Dubbo RSL Club
PROJECT VALUE: $16 MILLION
PROJECT DESCRIPTION: Extension and refurbishment to the existing Club
premises, built originally in 1946. The extension was to create a new
vibrant image for the Club, and to be recognized as one of the finest
Clubs in the State.
special features:
The structure design required simple, uncomplicated framing while
still achieving the aesthetics required by the architect. Existing club
operations continued during the construction.
scp involvement:
Concept design
Innovative and economical solutions sought
Detailed Design and Documentation
Construction Supervision
|
|
|
Cultural Centre -
Homebush
END CLIENT: soka gakkai international Australia
PROJECT VALUE: approx $3.6 million
PROJECT DESCRIPTION: A new Buddhist Administration Office and Culture Centre.
special
features:-
Structural steel elliptical dome roof and
ceiling providing a 20m x 30m clear open space.
High sound insulation criteria had to be met
to prevent noise associated by chanting disturbing neighbours.
scp
involvement:
Prepare civil and structural drawings for
tender and for construction.
Provide construction inspection services.
|
|
|
CLC ,
NORWEST ESTATE
END CLIENT: HILLS
CHRISTIAN LIFE CENTRE
PROJECT VALUE: $ 6.0 million
PROJECT DESCRIPTION: A new college and office facility.
special features:-The building required a temporary seating
capacity of 1500 people, and be capable of conversion into future office
space. Allowance in design for future expansion including a 3500 seat
auditorium
33m clear span portals
scp involvement:
Full detail design and documentation.
Assistance to builder during construction including inspections
|