Industrial Projects
|
|
CSR Sawmill - Oberon
END CLIENT: CSR PTY LTD
PROJECT VALUE: $65 MILLION
PROJECT DESCRIPTION: Construction of a new sawmill adjacent to an existing
sawmill at Oberon,
specifically to utilize a significant volume of the State recyclable pine
forest resources. Logs are
sawn and sold as timber products while waste is used to make MDF particle
board.
Special
Features:
One of the largest sawmills in Australia.
World benchmark technology and processes.
|
|
|
Primo Smallgoods - Chullora
END CLIENT: p & m quality smallgoods
PROJECT VALUE: $25 million
PROJECT DESCRIPTION: A new state of the art bulk meat and smallgoods
processing facility comprising of offices, production hall and freezer facilities covering
15,000 s.q.m.
special
features:
Steel portal frame design with 25m long transfer trusses to give large
column free production areas.
600 tonnes of structural steelwork including suspended overhead walkways
and support structure for production plant.
|
|
|
TCC - Port Botany
PROJECT:-
submarine fibre optic Cable factory
END CLIENT: tasman cable company
PROJECT VALUE: $130 million in five stages
PROJECT DESCRIPTION: High technology factory and office complex for the
manufacture of undersea
fibre optic cables and for its storage before delivery
onto a ship for subsequent installation.
Special
features:
First purpose-built facility of its type in the world.
100 tonne crane to handle 90 tonne bobbins.
Dynamically compacted sand foundation
|
|
CHIMNEY STACK,
QUEENSLAND
END CLIENT:
AUSTRALIAN BURNER MANUFACTURERS
PROJECT DESCRIPTION: Detailed design for 60 metre high unlined steel
stack for pilot plant on
Queensland Coast in a cyclonic region.
Special
Features:
Steel design to AS 4100 using latest local buckling rules. Chimney also
assessed to British Standard BS 4076. Long-wind
and cross-wind responses analysed using dynamic method of AS 1170, Part
2
SCP Involvement:
Structural design of all steel elements for documentation by Australian
Burner Manufacturers
|
|
|
UDA - Huntingwood
END CLIENT: united distillers Australia
PROJECT VALUE: $25 MILLION
PROJECT DESCRIPTION: A new bottling and canning facility on an 8.5 hectare
site
Special
Features:
High rise warehouse
featuring fully automated stock placement / retrieval, 20 metres high.
Column free awning areas 10 metres wide.
Built on poor ground, former tip with highly reactive ground conditions.
Super flat floor to High Rise Warehouse.
|