Infrastructure Projects
|
|
HMAS
Albatross Nowra - redevelopment
END
CLIENT: department
of defence
PROJECT VALUE: $110 million (Total project value )
PROJECT DESCRIPTION: Redevelopment of the HMAS Albatross site at Nowra.
SPECIAL
FEATURES:
- AIR
TRAFFIC CONTROL TOWER & ADMINISTRATION
BUILDING
-
HANGERS
& ADMIN. BUILDING FOR THE 805/816 SQUADRON
- AVIATION SYSTEMS TRAINING CENTRE
- GYM & HELICOPTER UNDERWATER ESCAPE TRAINER
- HELICOPTER CORROSION CONTROL FACILITY
- AIRCRAFT SHELTERS FOR THE RNZAF No.2 SQUADRON
- 8 EXPLOSIVE ORDNANCE BUILDINGS
- NASPO & NALMS ADMINISTRATION BUILDINGS
- AIRCRAFT WASH FACILITY
- PHOTOGRAPHIC CENTRE
|
|
FOX STUDIOS AUSTRALIA
2000 CAR CAPACITY CARPARK
END
CLIENT: BOVIS LEND LEASE DEVELOPMENT / FOX STUDIOS AUSTRALIA
PROJECT VALUE: $450 MILLION (Total Project
Value)
PROJECT DESCRIPTION:6
Level Post Tensioned Car-park
special features:
52000m2 of Post Tensioned Concrete Floor Slabs
8500m2 Floor Plate per floor.
Structural steel box trusses hung from facade create a billboard to
showcase Fox Studios latest attractions.
scp involvement:
Design and documentation of all structural elements
Extensive coordination with architectural consultants produced a
structure with high quality aesthetic appeal.
|
|
|
Parramatta Bus / Ferry Interchange
PROJECT:- parramatta
ferry / bus interchange
END CLIENT: department of
transport, sydney ferries
PROJECT DESCRIPTION: The Parramatta Transport Interchange is a facility
for ferry and bus commuters, replacing the existing waiting area and canopy with a larger facility
adjacent to the river foreshore.
special
features:
Canopy structure to cater for 200
passengers waiting and 200 passengers alighting from the ferry.
Structure to withstand 1 in 100 year floods which results in water levels
immersing 65% of the structure.
The architecture of the wharf is based on a maritime theme which is
reflected in the use of the canopy as a tensile structure.
|
|
|
Abbotsford Wharf
END CLIENT: Department of Transport
PROJECT VALUE: $1.7 million
PROJECT DESCRIPTION: New wharf and roadwork’s to service Sydney Ferries and
Rivercat Passengers.
Special Features:
Precast pretensioned concrete planks to
span over submarine electrical corridor.
Marine environment required careful consideration of concrete durability and
construction methods over water.
SCP Involvement:
SCP design used large amount of precast
elements to reduce formwork costs over water and construction time.
|
|
|
Liverpool Railway Station
PROJECT:- LIVERPOOL RAILWAY STATION
END CLIENT: CITYRAIL & DEPARTMENT OF TRANSPORT
PROJECT VALUE: $15 MILLION (Concourse building)
$5.5 MILLION (Transport interchange)
PROJECT DESCRIPTION: New elevated
railway concourse over main southern railway line incorporating passenger
links to bus and rail platforms. The concourse structure was designed to
accommodate the transport interchange and main southern railway line design
requirements. While achieving the requirements of the authorities, SCP also
incorporated the building form and finishes nominated by the architects The transport
interchange included transport requirements for commuters using buses, taxis
and private cars.
|
|
Malabar
Sewerage Treatment Plant
PROVISION OF BIOSOLIDS STORAGE AND STABILISATION FACILITIES
END
CLIENT: BOVIS LEND
LEASE / CH2 MHILL Joint venture
PROJECT DESCRIPTION: A new state of the art facility for lime
stabilisation and storage of Biosolids from sewerage treatment.
SCP Involvement:-
structural steelwork for Stabilization building including roof
mounted monorail post-tensioned jointless concrete floors to both Stabilization and
Biosolids storage building for heavy plant and equipment loads structural steelwork for Biosolids building including roof mounted
conveyor supports structural steelwork for conveyors from Stabilisation building to
Biosolids storage building miscellaneous steelwork for support of services
|
|
|
Newcastle Bus / Rail Interchange
PROJECT:- newcastle
bus rail interchange – refurbishment of existing station buildings
END CLIENT: department of transport
PROJECT VALUE: $3.5 million (total project cost)
PROJECT DESCRIPTION: Refurbishment of two existing Heritage Buildings to
provide facilities for Bus/Rail Commuters.
special features:
Removal of existing
load bearing walls to provide large open spaces.
Replacing these walls with moment resisting structural steel frames to
maintain resistance to earthquake loads.
Strengthening external cantilever walls by detailing new floor to wall
connections.
|
|
RAILWAY
STATION OAK FLATS
PROJECT :
oak flats station and
interchange
END CLIENT: Dept Of Transport / CityRail
PROJECT :
oak flats station and
interchangeproject value: $5.0 million
project description: Provision of new station building, new
platform, new car park and interchange facilities
SPECIAL FEATURES:
*
Exposed recycled hardwood timber rafters to station building *
Precast U-units to platform
SCP
INVOLVEMENT:
*
concrete works to station building *
steelwork to station building *
recycled timber rafters to station building *
new platform *
car park and all external pavement *
bus shelters and concrete road
|
|
COMMUTER CARPARK, PADSTOW
PROJECT:
Padstow Commuter Carpark
END
CLIENT: Department of Transport
PROJECT
VALUE: $4.0 Million
PROJECT
DESCRIPTION: 3 Storey split level carpark for Padstow Railway Commuters.
SPECIAL
FEATURES:
*
Post tensioned split level carpark
*
2 column arrangement with bands perpendicular to piles and with
4m cantilevers
*
Carpark designed to have an additional 2 levels. Use of couplers
at roof columns.
*
Watertight roof slab.
SCP
INVOLVEMENT:
Full
structural design of post tensioned carpark as well as full structural
design of footing system to bridge existing sewer line passing through the
middle of the carpark and co-ordination with RSA to ensure all design
complied with train impact requirements.
|
|
|
Sydney Harbour Bridge Traffic Gantries
END CLIENT: New South Wales Department of Main Roads
PROJECT DESCRIPTION: A traffic control system using electronic lane
indicators on the Sydney Harbour Bridge.
special
features:
Spans from 27 metres
to 35 metres.
Varying support
conditions under each trestle.
INDUSTRY
AWARD:-
Received
Highly Commended Award in 1986 Institution of Engineers Engineering Excellence Awards, Public Works Category in recognition of distinction in engineering
achievement.
|
|
Sydney Showgrounds -
Homebush Bay
END CLIENT: Royal
Agricultural Society
PROJECT VALUE:
$100 Million
PROJECT DESCRIPTION: 11
Animal Pavilions at the New Sydney Showgrounds located in the Sydney suburb of
Homebush.
BUILDINGS
INVOLVED:
Cattle Pavilions
incl. on-site dairy
Horse Pavilions
Pony Pavilions
Pigs / Alpacas / Goats Pavilion
Horse Marshalling Areas
SCP INVOLVEMENT:
Concept design and Value Engineering
Detailed Design and Documentation
Construction Supervision and Services
|