Warehouse Projects

Australian pharmaceutical industries

END CLIENT: general property trust
PROJECT VALUE: $30 million
PROJECT DESCRIPTION: Distribution facility for pharmaceutical products including a 25,000 square metre warehouse floor and 4,400 square metres of office space.
special features:-
Post-tensioned warehouse ground slab. Slab pours up to 49m x 43m using laser guided screeding. Racking post loads up to 5.2 tonnes. Light structural steel roof framing with 25m x 10.83m grid set out. Three internal lightweight structural steel mezzanines. Portal frames to resist lateral wind loads in each direction alleviating the need for internal wall bracing. Warehouse air-conditioned to 25oC. Post-tensioned second floor office slab (flat slab with drop panels) Precast facades in office and warehouse. Concrete pavements for truck manoeuvring and dock area. AC carpark.

HILL WINE GROUP STORAGE FACILITY, SILVERWATER

END CLIENT: T D & R J HILL INVESTMENT CORPORATION
PROJECT VALUE: $20 million
PROJECT DESCRIPTION: A wine storage and distribution facility including a 6,100 square metre warehouse and a 2,000 square metre office.
special features:-
Post-tensioned warehouse ground slab with racking post loads up to 4.0 tonnes.
Light structural steel roof framing with 20m x 10.83 grid setout. Two internal lightweight structural steel mezzanine offices for dispatch and receipt. Ten dock levellers. 400 sq.m. air conditioned area within the warehouse. Precast façade to the warehouse Post-tensioned second floor office slab (band-beams on 8.4m grid)

defence national storage & distribution centre

END CLIENT: Department of Defence
PROJECT VALUE: $110 million
PROJECT DESCRIPTION: Consolidation of storage and distribution functions for Department of Defence
at Moorebank. Involved 26 new buildings of total floor area 90,000 square metres and the refurbishment
of 26 existing buildings to meet modern requirements.
Special features:
Major implementation of quality systems to AS 3901.Significant savings in buildings resulted in savings on original scope of work, allowing additional improvements on the site.
Significant innovations to reduce costs. Buildings suited to all forms of storage including high risk racking systems. Existing operations on site continued during construction. Design period compressed to 18 months, on going during construction.

modern group

END CLIENT: modern group of companies
PROJECT VALUE: $6.5 million
PROJECT DESCRIPTION: A warehouse and office development including a 2,830 sq.m. warehouse and a 1,300 sq.m. office.
special features:-
Precast façade panels to office and warehouse
Conventionally reinforced band-beams and slab to suspended office floor
Structural steel portal frames to warehouse
Conventionally reinforced ground slab to warehouse

 

Peri - Glendenning

PROJECT: PERI , GLENDENNING
END CLIENT: PERI AUSTRALIA PTY. LTD.
PROJECT DESCRIPTION: A new head office and factory development for a German Formwork and Scaffold Company.
special features:
Used Peri formwork for walls and suspended slab.
Joint free post-tensioned ground slab to factory.
Suspended concrete roof slab over office designed to allow for future office expansion.
10,000sq.m. of concrete slab pavement for storage of construction equipment.

 

Interfab - Norwest

PROJECT:- interfab NORWEST business PARK
END CLIENT: INTERFAB HOLDINGS PTY LTD
PROJECT DESCRIPTION: A second stage extension to an existing facility. The development included a 2 storey office with a high clearance factory behind.
special features:
Precast wall panels to factory and office
7.0m springing height to factory to provide high clearance
Stainless steel tubular space truss awnings
Stainless steel window and door awnings

 

Samsung - Homebush

PROJECT:- samsung - homebush
END CLIENT: samsung electronics Australia pty ltd
PROJECT VALUE: $6.5 MILLION
PROJECT DESCRIPTION: A New 4600 sq.m. Warehouse and 2150 sq.m,. 2 Storey Office Development.
special features:
Structural steel portal frames at 9.0m centres.
Suspended flat slab with drop panels for 2 storey office.
Concrete pavement for truck turning and dock area.
scp involvement:

Prepare structural and civil drawings for tender and for construction.

 

Sanitarium - Tuggerah

PROJECT:- sanitarium, tuggerah business park
END CLIENT: sanitarium health food company
PROJECT VALUE: $ 2.0 million approx.
PROJECT DESCRIPTION: A new 1850 sq.m. food production line facility including an administration office.
Special features:

Tilt-up wall panels to both production building and administration office
Banded mezzanine slab 
Structural steel curved roofs supported off wall panels (7.0m springing height)
Concrete internal and external pavements

 

Australia Centre - Homebush

DEPARTMENT OF SOCIAL SECURITY
BRONSON & JACOBS       
COLLEGE OF PHYSICAL EDUCATION
ALFA LAVAL
SOKA GAKKAI    
PHILIPS
NSW STATE LOTTERIES
SAMSUNG
DAEWOO
SCP has an on-going role with Bovis Lend Lease to develop projects for individual clients at this site. The diverse nature of the client requirements necessitated creative design solutions.